Development of flexible and integrated systems

Definition of a system of function management design
production and logistics adapted to different types of
manufacturing operations involving a high level of
technology

The scope is production management of a manufacturing plant following computer integrated manufacturing (CIM) philosophy. The basic principle is built upon an upstream control (master schedule), a medium term planning beyond the traditional materials resource planning (MRP) concept and a short term management of the workshop allowing for downstream regulation.
Acronym: 
PARADI
Project ID: 
21
Start date: 
01-06-1986
Project Duration: 
91months
Project costs: 
18 800 000.00€
Technological Area: 
Market Area: 

Raising the productivity and competitiveness of European businesses through technology. Boosting national economies on the international market, and strengthening the basis for sustainable prosperity and employment.